STAND WITH ME
  • About Us
    • Our Team >
      • Guatemala 2025
    • Our Workshops
    • Our Partners
  • Home
  • Our Impact
    • Our Patients
  • PT Zone
    • About Standing Therapy
  • Resources
    • Instructions for Constructors
    • Request A Stander
  • Volunteers
    • Our Newsletter
    • Blog
  • Donate
  • Contact Us

First Cuts

6/11/2015

0 Comments

 
The first full day of work with the whole team resulted in the successful cutting of two templates!
We also had our first wound. Although her finger was grazed by a cotter, with the help of a Band-Aid, Alé is expected to live. The majority of the day was spent in the CAD lab, since designing templates that are effective for making standing frames while also easy to build is challenging. For a router to cut the slots needed on the standing frames, we must first develop what essentially functions as a large stencil for power tools. Since tools like routers have a lot of power, cutting the standing frames requires this type of guidance.
These screenshots show the template for the standing frame’s backboard during the designing phase in CAD. A significant amount of time goes into ensuring that the measurements are precise so that we can use all of our resources efficiently. We are only using one sheet of 4’ by 8’ plywood to make two standers, and the pieces that are cut away from the backboard are used for the headpieces and tray table.
0 Comments

Riley & Routers

6/10/2015

0 Comments

 
Alé and Emily started the day with a short, chilly run in the morning fog before Alé and Scotty went to Pompanousuc Mills to get suggestions on what tools can be optimized for making various parts of the standers. It was especially helpful to gain preliminary information that informed the process of designing the templates for the (ever difficult) router. After hours spent using CAD, we were able to design our initial templates!

At 4:00 pm, Scotty and Emily met Riley at the Dartmouth Coach near campus, and welcomed him to the team with a trip to get his first ever bubble tea (which he was diplomatic about). We went with the entire team to test our endurance in cold water with a brisk swim at Mink Brook. To ensure good group dynamics, we were obligated to do a bit of “hazing” and test Riley with trial by fire. After going out to a group dinner at Thai Orchid, we spotted Emily’s mom across the street looking at a jewelry vendor with her little sister Rosie. We immediately came up with the idea to send Riley over without introduction and propose to Rosie using the rings from the vendor. Riley was a champion and did it without hesitation. To say the least, he immediately fits into the group and has already started working on learning CAD and developing the new website!
​​
0 Comments

Moving Day

6/8/2015

0 Comments

 
College students are no strangers to lugging over-stuffed, asymmetrical boxes through narrow hallways, into a spring downpours, and packing them into suddenly much-smaller-than-remembered vehicles- but today was especially impressive. Alé and Emily moved all of Scotty’s worldly possessions (mostly bowties). We also moved everything we would need for the next few weeks to live at the condo near Dartmouth as we prepare to go abroad.

After moving in, we spent the majority of the day working in Thayer at the Computer Assisted Design lab (CAD), where Scotty and Alé brainstormed solutions to the many challenges posed by developing a usable template. We spent hours sketching, bouncing ideas back and forth and pacing around the model standing frame (complete with a teddy bear strapped comfortably in place!). We have a few ideas after examining existing parts, but as of now the template remains a work in progress. The team is headed out early tomorrow morning to Pompanousuc Mills to ask the experts what they think!

Ironically, our biggest issue so far has been overcoming incomplete and broken routers. Hopefully the (second) one we order straight from the factory will be in working condition.


The team is excited to meet Riley tomorrow!

0 Comments
Forward>>

    SWM Team 

    This blog is a daily story of our team activities around the world.

    Archives

    August 2019
    November 2018
    August 2017
    July 2017
    June 2015

    Categories

    All

    RSS Feed

ADDRESS

Office Address:
Stand With Me
C/O Scott Mitchell
160-7 Cedar Breeze S.
Glenburn, ME 04401


Factory Address:
​Carretera Interamericana CA1 km 40 Entrada Santo Domingo Xenacoj no.246 Sacatepequez, Guatemala

CONTACT US

Contact Email: [email protected]
Guatemala Contact Phone No: 502 30814244


SUPPORT US

Donate
© COPYRIGHT 2015. ALL RIGHTS RESERVED.
  • About Us
    • Our Team >
      • Guatemala 2025
    • Our Workshops
    • Our Partners
  • Home
  • Our Impact
    • Our Patients
  • PT Zone
    • About Standing Therapy
  • Resources
    • Instructions for Constructors
    • Request A Stander
  • Volunteers
    • Our Newsletter
    • Blog
  • Donate
  • Contact Us